Here’s a recent job we wrapped up for a customer looking to create a solid parking space for their trailers.
- Tyler Basche
- Aug 26
- 1 min read
Here’s a recent job we wrapped up for a customer looking to create a solid parking space for their trailers. We started by stripping the topsoil, but quickly discovered unstable soil in the center of the planned area.
To ensure long-term durability, we excavated the middle section deeper and brought in over 100 tons of breaker rock to stabilize the base. We topped it all off with a layer of 3/4” crushed gravel, carefully graded and compacted for a smooth, reliable finish.
Now the customer has a clean, level, and sturdy gravel pad ready for trailer parking built to last.
Need a custom gravel pad or site prep work done right?
(920) 680-9778




_edited.jpg)















Comments